DLT Engineering
Reference Project
Construction Equipment
Construction Engineering
Site Services
MOSAIC K3 Potash mine Canada
MOSAC K3 Mine DLT Engineering designed and supplied a 4 x 250 tonne capacity Pinned Climbing Jack System for use in an innovative construction system for the south shaft headframe developed by HATCH. The pinned climbing jacks are used to lift and lower a construction platform within the headframe building as shown in the video below. DLT pinned climbing jacks provide a safe and effective means to move and hold heavy loads vertically, horizontally or at any angle in between and can be centrally monitred and controlled using our DL-P40 computer control system.